Case Studies
We deliver high quality, cost-effective spatial data collection services to Local, State, Federal Government, Utilities and Industry.
















































Case Studies
We have an extensive list of case studies available – here’s just a few
Preparation of Road and Park Surface Polygons
The City of Melbourne is developing and configuring an asset management software solution for all Council assets. To assist with the registration and management of road and park assets, Council needed a series of surface polygons over the roads and parks within the municipality.
Kerb, Gutter and Traffic Facilities Condition Audit
North Sydney Council has approximately 272km of kerb and gutter and 1157 traffic facilities under its care, control, and management. The works involved a detailed condition audit of kerb and gutter and traffic facilities within the North Sydney Council LGA.
Asset Inventory Survey
The project required the accurate mapping and collection of asset inventory data for a range of assets along 1621.5 km of freeways, highways and main arterial roads under VicRoads responsibility across 13 municipalities located in the north east, east and south east of Melbourne.
Bus Stop DDA Compliance Project
To develop a set of DDA compliance guidelines and carry out a DDA compliance assessment for all bus stops within the Willoughby City Council LGA.
Preparation of Road and Park Surface Polygons
The City of Melbourne is developing and configuring an asset management software solution for all Council assets. To assist with the registration and management of road and park assets, Council needed a series of surface polygons over the roads and parks within the municipality.
Kerb, Gutter and Traffic Facilities Condition Audit
North Sydney Council has approximately 272km of kerb and gutter and 1157 traffic facilities under its care, control, and management. The works involved a detailed condition audit of kerb and gutter and traffic facilities within the North Sydney Council LGA.
Asset Inventory Survey
The project required the accurate mapping and collection of asset inventory data for a range of assets along 1621.5 km of freeways, highways and main arterial roads under VicRoads responsibility across 13 municipalities located in the north east, east and south east of Melbourne.
Bus Stop DDA Compliance Project
To develop a set of DDA compliance guidelines and carry out a DDA compliance assessment for all bus stops within the Willoughby City Council LGA.
Data Collection and Valuation
Sutherland Shire Council required asset data collection, condition assessment and valuation of all parks and open space assets in approximately 615 sites within the LGA.
Railway Station Infrastructure Data Collection & Condition Assessment
As part of the TSC3 funding development project, RapidMap were contracted to work with AssetFuture to map, attribute and condition assess infrastructure assets at over 140 railway stations in S.E. Queensland.
Drainage Data Collection & Revaluation
The provision of municipal stormwater drainage network data collection and revaluation, to enable the collection of a complete inventory to update Council’s GIS, financial and Assets databases. The data collection was undertaken throughout the entire Maribyrnong LGA.
Sports Fields Data Collection
To collect detailed sports field information and associated infrastructure to assist Council in planning, asset management, turf maintenance and financial management purposes.
Drainage Data Collection & Revaluation
The provision of municipal stormwater drainage network data collection and revaluation, to enable the collection of a complete inventory to update Council’s GIS, financial and Assets databases. The data collection was undertaken throughout the entire Maribyrnong LGA.
Sports Fields Data Capture
To collect detailed sports field information and associated infrastructure to assist Council in planning, asset management, turf maintenance and financial management purposes.
Mapping & Condition Assessment of the Sewer System
The Falls Creek sewer system has been progressively developed since the resort was established in the 1950’s and existing documents regarding the location and extents of the system are incomplete and have been poorly maintained.
Asset Data Collection for Parks and Open Spaces
The City of Casey is Victoria’s most populous municipality. They needed to collect asset information and condition data for over 2,450 parks and reserves for asset management and to assist with new maintenance contracts for Open Space Amenity Maintenance, Sports Fields, Turf and Landscape Maintenance.
Reserves Assets Data Collection & Condition Assessment
The City of Port Phillip covers an area of approximately 21 Km2 with a population of approximately 87,000. Port Phillip is known for its cultural diversity, artistic community, magnificent heritage buildings, foreshore which stretches over 11 km, beautiful parks and gardens and tree lined streets.
Stormwater Drainage Inventory & Condition Survey
To collect drainage inventory data to complement the existing stormwater drainage data in Council’s Asset Management System and determine the overall condition of the Stormwater drainage assets. All asset locations were verified and recorded.
Validation of Existing Street Light Data & Data Collection of Additional Lights
To validate existing Energex street light data to ensure the spatial location, addressing and textural attributes were correct, and to collect new street light data along roads and in parks and reserves.
Reserves Assets Data Capture & Condition Assessment
The City of Port Phillip covers an area of approximately 21 Km2 with a population of approximately 87,000. Port Phillip is known for its cultural diversity, artistic community, magnificent heritage buildings, foreshore which stretches over 11 km, beautiful parks and gardens and tree lined streets.
Stormwater Drainage Inventory & Condition Survey
To collect drainage inventory data to complement the existing stormwater drainage data in Council’s Asset Management System and determine the overall condition of the Stormwater drainage assets. All asset locations were verified and recorded.
Validation of Existing Street Light Data & Data Capture of Additional Lights
To validate existing Energex street light data to ensure the spatial location, addressing and textural attributes were correct, and to capture new street light data along roads and in parks and reserves.